Rail Systems

Low-current systems across station, tunnel, depot and control centre scopes on metro, tram, commuter and high-speed rail lines.

Overhead cable tray installation from scaffolding at a station
site-gorselleri/rail-hero.jpgOverhead cable tray installation from scaffolding at a station

What We Do

01

Station Systems

Installation and integration of CCTV, public address and voice alarm, passenger information, clock, access control, telephony and local network systems.

02

Tunnel & Trackside

Tunnel communication and emergency call points, voice alarm, trackside cable infrastructure and field device installation.

03

Depot & Workshop

Public address, communication, electronic security and network infrastructure across depot areas.

04

Operations Control Centre

SCADA RIO panels, media converter panels and system integration for main and back-up control centres.

05

Signalling Support

Field implementation, cabling and engineering support for signalling systems, integrated into the main contractor's programme.

06

Working Under Operation

Night possession planning on lines in passenger service, handover–handback procedures and safety practices.

Where We Make the Difference

We have worked on metro, tram and main-line rail projects for over a decade. We know the rules of this field: working narrow possession windows on a line in service, track access procedures, HSE requirements and reporting. Our team is built to meet those conditions.

  • Delivery across station, tunnel, depot and control centre scopes
  • Night work and possession-window discipline on lines in service
  • Subcontracting experience with main contractors and signalling firms
  • Experience in documentation for the approval processes of the assessing authorities

System Experience

The system disciplines we design, install and commission within project scope.

TNS

Transmission Network Systems

Backbone transmission, synchronisation and network management.

ICT

Fixed Voice & Structured Cabling

Exchanges, field telephony and copper/fibre structured cabling.

CCTV

Closed-Circuit Television Systems

Station, tunnel and facility surveillance, recording and video management.

PAVA

Public Address & Voice Alarm

Passenger announcement, emergency voice evacuation and line supervision.

PID

Passenger Information Display

Platform and station passenger information displays and central content management.

MC

Master Clock Systems

Central time source and station-wide clock synchronisation.

ACS

Access Control Systems

Card access, turnstiles, door automation and intrusion detection integration.

FIRE

Fire Detection & Alarm Systems

Addressable detection, aspirating systems and evacuation scenarios.

LAN / FO

Local Area & Fibre Optic Networks

Active/passive network infrastructure, fibre pulling, splicing and testing.

UPS

UPS & Power Supply Systems

Uninterruptible power supply, DC feeding and power distribution infrastructure for system panels.

SIG

Railway Signalling

Field implementation and engineering support for signalling systems.

Rail References

Marmaray BC1 & CR3

Türkiye · 2013–2021
Design, Supply, Installation
CCTVPAVAPIDClockLANSCADA RIO PanelsMedia Converter PanelsBack-up & Depot OCC

Marmaray Haydarpaşa

Türkiye · 2023–
Design, Supply, Installation
FO WANMPLSGSM-RTETRACCTVPAVAUPSAccess ControlPIDClockTelephoneLAN

M5 Metro Line

Türkiye · 2015–2017
Design, Consulting, Installation
CCTVPAVAAccess ControlPIDClockTelephoneLAN

T5 Eminönü–Alibeyköy Tram Line

Türkiye · 2018–2020
Design, Supply, Commissioning
PAVA

M7 & M8 Metro Lines

Türkiye · 2019–2023
Technician & Manpower Support for Installation and Maintenance

From Site

Cabinet installation and commissioning in an equipment room
site-gorselleri/saha-01.jpgCabinet installation and commissioning in an equipment room
Trackside pole and cable pulling work
site-gorselleri/saha-02.jpgTrackside pole and cable pulling work
Cable pulling work inside a station
site-gorselleri/saha-03.jpgCable pulling work inside a station
Panel and system checks in a control room
site-gorselleri/saha-04.jpgPanel and system checks in a control room

Contact

Tell us about your project scope and we will work out together whether you need design support, site delivery, or both.

Get in Touch